精品国产乱码久久久久久91熟女_亚洲av日韩aⅴ无码色老头_日韩视频免费在线观看_极品白丝嫩模被大哥操_日日澡夜夜澡人人高潮视频片源不錯的選擇!_亚洲欧美国产日韩一区_有毛a视频在线观看_国产成人网站在线观看_国产美女流白浆在线观看_男女上下抽搐动态图

Email|Resource Center|Supplier Platform|Chinese/English
News Center

Current location:Home > News CenterNews Center

The electric high-pressure pressure balancing plug valve was delivered successfully in Liaohe oil field gas storage

2022-10-03browse:

On September 27, the electric high-pressure pressure balance plug valve for Liaohe Oil field gas storage was successfully delivered by the company. The batch of valves included 24-600, 20-600, 20-900 and other specifications. The products will be applied in the ground engineering gathering station of Liaohe Shuangtai gas storage Group.
Liaohe underground gas feeding project is by panjin of liaoning province government and China petroleum liaohe oilfield branch jointly invest in the construction of underground gas feeding, after the completion of project construction, gas feeding the stronger capacity of 5.3 billion cubic meters to 24.1 billion cubic meters, work volume will increase from 1.6 billion cubic meters to 11.5 billion cubic meters, Will become the northeast and beijing-tianjin-hebei region's largest natural gas underground reserve center, take the liaoning province, northeast, and natural gas peak shaving is protected for the task of the beijing-tianjin-hebei region, at the same time, the project operation marked the liaohe oilfield exploration of gas drive oil gas storage mode for building a collaborative expansion is a success, created the Chinese petroleum gas drive coordination capacity building.
The delivery, inspection and inspection of the plug valve project highlights the company's recent achievements in automation and digital construction:
1) The first use of self-research equipment vertical self-grinding adjustment machine in the process of large diameter plug valve grinding plays an important role, improve the surface accuracy and red oil inspection consistency, effectively guarantee the delivery speed of products and improve the stability of products.

2) The total factors of the order flow in PDM/ERP/MES/QMS information system, and test a batch of new information construction achievements, such as design information, procurement information (cooperation), production information, and full quality traceability. It has accumulated rich experience for the improvement of R&D design, collaborative manufacturing, customized service, supply chain management, whole life cycle management and information value-added service in the later stage.